Sorry I found no matches, Please try again. 176
vid = 3322pws_id = 350460pws_id = 350460
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.138.114.132 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Bristol STW Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Bristol STW Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Bristol STW Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, avonmouth    
Type of installation: Wind    on/offshore: on
Turbines :4  Capacity : 8.2 MW
Approx Date of 1st power generation: November 2013

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Triodos Renewables acquired the Avonmouth wind turbine project in September 2012 from Wessex Water Limited. The four 2.05MW wind turbine site commenced generation in November 2013 and is Triodos Renewable’s first project in the South West.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Bristol Sewage Treatment Work, Bristol, BS11 0YS

 Associated Companies.

Relationship Company (For: Bristol STW )
AgentThe Landmark Practice
AgentThe Landmark Practice
DeveloperTriodos

 DECC Data on this Project: Bristol STW :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Avonmouth Wind Power     8.2 MW
Energy Type: Wind Onshore
County: Avon     Country: England     LPA: Bristol City Council
Site ID and Reference: 3664 / A0013     District:
Applicant: Wessex Water Engineering Services     Application : 08/04925/F (Go to search to find Application)
For Wind Farms  
Number of Turbines: 4 Turbine Capacity: 2.0499999999999998
Height of Turbines: Calculated capacity: 8.2
Site Address: Bristol Sewage Treatment Work, Bristol, BS11 0YS
 
County: Avon Region: South West
OS Coordinates: 353358 / 353358
Development Status: Operational
Application Submitted: 12/8/2008 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 12/3/2012    
Generator Live 2/6/2014 This Record Last Updated: 2/27/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Bristol STW: Wind :

Site Name: Triodos Renewables (Severn) limited
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00323RQEN
Capacity: 8120 Status: Live
Accreditation Date: 12/8/2008    
Commission Date: 11/21/2013    
Applicant: Triodos Renewables Ltd
Applicant Address: Triodos Bank Deanery Road Bristol BS1 5AS England
Address: TREATMENT WORKS WESTON LANE AVONMOUTH BRISTOL BS11 0YS England

Site Name: Triodos Renewables (Severn) limited
Generator Type: Wind
Scheme : REGO Generator ID: G02320NWEN
Capacity: 8120 Status: Live
Accreditation Date: 12/8/2008    
Commission Date: 11/21/2013    
Applicant: Triodos Renewables Ltd
Applicant Address: Triodos Bank Deanery Road Bristol BS1 5AS England
Address: TREATMENT WORKS WESTON LANE AVONMOUTH BRISTOL BS11 0YS England
 
Assumptions: Capacity: 8120kW 8.12 MW,
Thus over the month Capacity * 720 hours per month = 5846.4 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 1977 24.35% Issued
01/02/2018 1488 18.33% Issued
01/01/2018 2623 32.30% Issued
01/12/2017 1947 23.98% Retired
01/11/2017 1346 16.58% Retired
01/10/2017 2020 24.88% Retired
01/09/2017 1373 16.91% Retired
01/08/2017 1190 14.66% Issued
01/07/2017 1329 16.37% Issued
01/06/2017 1847 22.75% Retired
01/05/2017 1232 15.17% Issued
01/04/2017 832 10.25% Issued
01/03/2017 2375 29.25% Issued
01/02/2017 2018 24.85% Issued
01/02/2017 90 1.11% Revoked
01/01/2017 1197 14.74% Issued
Dec-16 0910 1022 12.59% Pending Tr
Nov-16 01355 1505 18.53% Pending Tr
Oct-16 0899 1005 12.38% Pending Tr
Sep-16 01213 1347 16.59% Pending Tr
Aug-16 01447 1607 19.79% Pending Tr
Jul-16 01297 1441 17.75% Pending Tr
Jul-16 01297 1441 17.75% Pending Tr
Jun-16 0888 994 12.24% Pending Tr
May-16 01014 1133 13.95% Pending Tr
Apr-16 01247 1385 17.06% Pending Tr
Mar-16 01616 1796 22.12% Redeemed
Feb-16 02092 2325 28.63% Redeemed
Jan-16 02186 2429 29.91% Redeemed
Dec-15 03043 3381 41.64% Redeemed
Nov-15 02426 2696 33.20% Redeemed
Oct-15 0865 967 11.91% Redeemed
Sep-15 0802 897 11.05% Redeemed
Aug-15 0899 1006 12.39% Redeemed
Jul-15 17261553 1725 21.24% Redeemed
Jun-15 15121361 1513 18.63% Redeemed
May-15 21001890 1747 21.51% Redeemed
Apr-15 13421207 759 9.35% Revoked
Mar-15 19001711 1901 23.41% Redeemed
Feb-15 14041263 1403 17.28% Redeemed
Jan-15 23822144 2382 29.33% Redeemed
Dec-14 24962247 2497 30.75% Redeemed
Nov-14 12141087 1214 14.95% Redeemed
Oct-14 19881789 1987 24.47% Redeemed
Sep-14 449397 450 5.54% Redeemed
Aug-14 14831335 1483 18.26% Redeemed
Jul-14 701631 701 8.63% Redeemed
Jun-14 521469 521 6.42% Redeemed
May-14 13371204 1337 16.47% Redeemed
Apr-14 11561034 1155 14.22% Redeemed
Mar-14 15391385 1539 18.95% Expired
Feb-14 29892690 2988 36.80% Expired
Jan-14 22121991 2212 27.24% Expired
Dec-13 21061896 2107 25.95% Expired

 Calculations


Capacity: 16.4
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 12 m/s (26.844 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 5/16/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 16.4 start: 5 Optimum: 15/ Stop: 12 / wind: / ratio 350460

Project Info
©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School